Bonneville Dam
Columbia River Spillway Upgrades
• Pre-Design Measuring, Layout & Pre-Fabrication
• Installation of 2400 feet of 6” Concrete Lined Water Line
• Heat-Traced Piping
• Insulation with High Density Foam
• Metal Jacketing Application and Painting




